A concept for multi-day, city-wide power outages. Generator-backed public buildings and volunteer-run neighbourhood points give residents information and a way to call for help.
Map
Disaster Protection Lighthouses (Katastrophenschutz-Leuchttürme)
General Information
ISIG
Disaster Protection Lighthouses are generator-backed public buildings, supported by volunteer-run neighbourhood information points, where residents can get information and make emergency calls during a long power outage. The concept was designed and tested in Berlin by a federally funded research consortium, with the Berlin Fire Brigade as practice partner. It has three kinds of node: stationary lighthouses (Kat-L), a portable lighthouse on a vehicle for thinly populated areas, and information points (Kat-I) run by helpers from the neighbourhood and supplied with information from the lighthouse. The implementers report one two-day field test with about 150 specialist visitors and a staff exercise. They report that the specialist audience agreed with the basic idea, that most visitors doubted the involvement of the population would work, and that feedback stressed preparing the concept and informing residents before a crisis. The report documents a prototype and a test only.
In a long, large-area power outage, phone networks, internet and broadcasting fail, and residents lose both information and the means to call for help. The Berlin Fire Brigade's final report starts from the idea that buildings with emergency generators can serve as points of light, and from a citizen-near approach to crisis management. The work ran in a consortium led by TimeKontor AG with the Steglitz-Zehlendorf borough office, the Charité university hospital, the Berlin School of Economics and Law (HWR), Beuth University of Applied Sciences and Humboldt University.
The design drew on five historical disasters in Germany, the Slovenian blackout of 31 January to 19 February 2014, a trip to the area hit by Hurricane Sandy, a workshop on the 2013 Elbe flood, and two workshops in Lower Saxony and Lower Austria with more than 50 experts from outside the consortium.
Berlin's Senate and boroughs are now building a network that uses the same terms, Kat-L and Kat-I. Written answers of the Senate (Feb 2026) state 45 government-run lighthouses and 147 volunteer-run information points planned, with 14 lighthouses operational on 3 January 2026 (no source confirms however that the 2026 network derives from this project).
Hazard Type
Geographical Scope - Nuts
Population Size
Population Density
Needs Addressed
During a long power outage, residents cannot get reliable information, cannot call emergency services and cannot offer or ask for help. Authorities cannot see what is happening in neighbourhoods. When information and communication with and among the population fail, the crisis is likely to worsen. Unprepared, unaffiliated helpers also cannot be directed to where they are needed.
Based on the available information, it can be inferred that residents without a smartphone, with limited mobility or with limited German would be served less well unless the lighthouses and information points are adapted.
The design links a central crisis management at the top, borough-level lighthouses staffed by trained public administration staff, and information points run by helpers from the neighbourhood. Local nodes act on local information, while the information flow is organised from the centre. A city could run it with a stronger centre or with more volunteer ownership.
The concept assumes an existing civil protection authority, emergency services and a crisis management centre to which lighthouses connect. The report notes that the modules only work if resources are considered in advance planning.
Basic: a building with emergency power and a grid-independent communication link, or the portable unit on a vehicle.
Developed: a connected network of lighthouses with a control computer, emergency-call forwarding and optional modules such as water, medical care and psychosocial care.
In design: to learn what residents and authorities expect from a contact point in a blackout. In operation (as designed): to pass information down, collect situation reports from neighbourhoods, and match offers of help with requests.
A citizen questionnaire in Berlin's citizen offices, led by Berlin School of Economics and Law, with the fire brigade carrying out 10% of the surveys at its 2013 open day. Interviews with civil protection authorities and organisations in several federal states. A flood workshop in Magdeburg with authorities, aid organisations and citizens. Two expert workshops. An advisory board that met four times. A field test with an evaluation questionnaire. A round with journalists.
Residents' input shaped the design: the structure of a lighthouse was based on the citizen and staff surveys. No evidence was found that residents took part in decisions. In the design, helpers run the information points, but this was not tested with residents. The field-test audience consisted of specialist visitors, not of residents.
The design foresees trained public administration staff in lighthouses. A handbook for setting up and running a lighthouse was announced for after the project; The report does not describe training for information-point helpers. The field-test feedback asked for residents to be told, before a crisis, what the points offer and how to use them.
Vulnerable Groups
Governance
Emergency Preparedness
Engagement Level
Empowerment Level
Implementation
A building-block (modular) design. The basic lighthouse has trained staff, emergency power and communication in both directions. Its tasks are to receive and pass on current information, to allow an emergency call, to hold local information such as the nearest emergency well, to take and pass on offers and requests for help, to forward people to another lighthouse, and to supervise assigned information points.
Optional modules: childcare for emergency staff, two kinds of medical care, psychosocial support, showers, toilets, transport, emergency accommodation, food and water. Emergency accommodation reduces the lighthouse to its base functions.
A technical crisis communication system: visitors in the field test registered and logged in with their own smartphones to read information and send messages, and emergency calls reached the fire brigade control centre.
Suggested spacing: one lighthouse per forecast area and one information point per planning area.
German (report and demonstrator). The project film exists in German and English.
A civil protection or fire authority to lead; a district or municipal administration to staff and run lighthouses; a city or state crisis management centre as the top node; a university or research partner for design, legal review and evaluation; a technology provider for the communication system; volunteer organisations or neighbourhood groups for information points. In the original project, the Berlin Fire Brigade was practice partner and coordinated concept and testing, within a consortium led by a private firm.
The original implementer, the Berlin Fire Brigade, is a professional fire brigade and civil protection authority. It had run earlier research on blackout fuel supply, crisis information and unaffiliated helpers, and it coordinated the concept and test work in this project. A transfer needs an implementing organisation with comparable civil protection expertise, such as a fire brigade, a civil protection office or a municipal crisis team. The expertise of the organisation does not show that the concept itself works in a real outage: only a prototype and a field test are documented.
Civil protection authority and fire brigade (lead and practice partner). Borough or municipal administration (lighthouse staff). Volunteers from the neighbourhood (information points). Central crisis management. Universities (surveys, legal framework, technology). Hospital partner. Police and infrastructure operators as associated partners. Advisory board of fire, civil protection, radio and psychology experts.
- Analyse past blackouts and disasters and what residents and authorities expect.
- Consult residents and civil protection bodies through surveys, interviews and workshops.
- Define the lighthouse basics and the optional modules.
- Define the system of node types and where they go, using local statistical planning areas.
- Build and install the communication system, including a portable unit for thinly populated areas.
- Test in a field test with a staff exercise.
- Correct weaknesses.
- Write a handbook for setting up and running a lighthouse.
- Inform the public and decision makers.
Steps 1 to 7 were carried out in the project; step 8 was announced; step 9 was partly done through a film, fairs and talks. Legal framework: a legal handbook was written by a consortium partner.
The design was carried out with a research grant (grant no. 13N12424; the funder is the Federal Ministry of Education and Research (BMBF)). A new site needs a building with emergency power, communication equipment, trained staff and information material.
Ten work packages with named coordinators, four advisory board meetings and a field test. There is no monitoring after the project in the report.
Experience of the Implementing Organisation in DRM
Target Audience
Resources Required
Timeframe & Phases
Participation Results
Prepare the concept and inform residents before a crisis; Technical systems need support and staff training in handling; Opinions on which buildings should be lighthouses differ between cities: professional fire stations were contested in Vienna. Emergency accommodation limits what a lighthouse can do; A field test with specialists cannot show whether residents will use the points: the report notes the doubts of most visitors.
Reported difficulties: Representatives of the Vienna professional fire brigade strongly rejected using professional fire stations as lighthouses, which changed the further research; the concept still lists fire stations as one possible model. The police's personal-information systems were being reorganised and could not be connected before the project ended. The first analysis showed that thinly populated areas needed a different solution, so a portable lighthouse was added. The field test showed isolated technical weaknesses, corrected afterwards, and that staff needed technical support to handle the systems.
Residents do not know or trust the points: inform them before a crisis, as the field-test feedback asked. Buildings, generators or fuel are not ready: plan the resources in advance, as the report notes. Trained staff are not available at the right time: set staffing concepts and training early. Helpers are unprepared or legally uncovered: clarify their legal position first; a legal handbook exists but was not read. Technical systems need support in handling: plan technical help in each lighthouse. Roll-out is slow: Berlin's Senate answers show 14 of 45 planned lighthouses operational on 3 January 2026.
Risk & Mitigation Plan
Scalability and Sustainability
No public information on how lighthouses would be maintained after the project was found in the reviewed report. Based on the available information, it can be inferred that long-term operation depends on a public authority owning the buildings, the equipment and the training. In Berlin since 2022, the Senate administration procured and delivered initial equipment, the boroughs set up and run the lighthouses, and the Senate funds civil protection posts in the districts.
What scales: the three node types, the building-block modules, and the rule of one lighthouse per larger area and one information point per small neighbourhood, based on local statistical areas. What needs adapting: the number and location of nodes to local population and to which buildings have emergency power; the legal position of volunteers; the link to the local crisis centre and emergency-call system; language and accessibility services. The portable unit is the route for thin settlement but was tested only briefly.
A working demonstrator with a control computer, smartphone log-in, message sending and emergency-call forwarding, installed in a fire brigade staff room and on a vehicle. It was a prototype with corrections needed after the test, and the personal-information link was not integrated. "Developed" would fit a later version.
No public information on costs for a lighthouse was found in the report. Staff time of the fire brigade sub-project was 36 person-months of scientific staff and 18 of project staff, plus student assistants. A project brochure gives a total grant of EUR 2.3 million for the whole consortium, which is a research cost and not the cost of setting up a lighthouse. For a new site, the cost lines are: emergency power where missing, notebooks, screens and portable generators of the kind Berlin procured in 2022, grid-independent communication, a vehicle for a portable unit, training, information material for residents, and legal review.
None reported. Drivers: fuel and maintenance for generators, staff time in shifts, regular training and exercises, technical support, and upkeep of information points. A Senate answer of 2022 records a planning assumption of between five and 25 staff per site and shift, depending on the modules.
Interest from other cities and from Berlin's boroughs after the project is recorded by the implementers - how far it led to adoption is not documented in the report. The Berlin network is a decade after the design and had 14 of 45 lighthouses operational on 3 January 2026, so transfer takes years rather than months. The 2016 design assumed 60 lighthouses and 447 information points; the 2026 plan is 45 and 147. A transfer should set its own numbers from local buildings and population.