At Devisthal Basic School in Achham District, Nepal, children played a leading role in identifying and addressing a serious safety risk created by road construction near their school. Works along the mid-hill highway had left a steep, unprotected drop at the edge of the school playground. Through UNICEF's Child-Centred Disaster Risk Reduction (CCDRR) programme, members of the municipal child club network assessed the school's hazards, identified the missing boundary as a priority and proposed constructing a protective wall and fence. Their proposal was discussed with school authorities, municipal and ward representatives, UNICEF and implementing partners. The municipality allocated funding, the CCDRR programme supported the purchase of additional materials, and residents contributed voluntary labour. The completed structure improved children's safety and demonstrated how children's participation can influence local risk-reduction investments.
Map
Child Club-led School Risk Reduction in Achham
General Information
ISIG
The initiative at Devisthal Basic School illustrates the integration of children's participation into community-based disaster risk reduction and school safety planning.
The school faced a significant physical safety hazard after construction of the nearby mid-hill highway created a steep drop at the playground boundary. The absence of protective infrastructure exposed pupils to the risk of falls and required teachers to supervise activities continuously.
Through the UNICEF-supported CCDRR programme, children participated in assessing risks affecting their school. The municipal child club network worked with the school management committee, local government representatives, UNICEF, the Nepal Red Cross Society and MISS Bajura to identify priorities and determine feasible mitigation measures.
The children proposed constructing a compound wall and wire fence. The intervention was implemented through a cost-sharing arrangement combining municipal funding, programme support for construction materials and voluntary contributions from community members.
The completed boundary made the playground safer, prevented animals from entering school premises and helped protect trees planted under the school's greening initiative.
UNICEF introduced its Child-Centred Disaster Risk Reduction programme in Nepal in 2013, initially covering four disaster-prone districts, including Achham. The programme sought to strengthen the capacities of children, their families, schools and local institutions to understand hazards, reduce vulnerabilities and participate in preparedness and resilience-building activities.
The approach included establishing and strengthening child clubs, training children in disaster risk assessment and supporting cooperation between children's groups, schools, community organisations and local authorities.
At Devisthal Basic School in Achham, road construction created an immediate safety problem. The nearby mid-hill highway cut into the school's property, leaving part of the playground adjacent to a steep and unprotected drop.
Teachers attempted to prevent accidents through close supervision, but the physical hazard remained. The child club network identified the unprotected boundary as a priority during participatory risk assessment and consultations.
The resulting intervention became an example of how children's knowledge of their everyday environment could contribute directly to local risk reduction, with institutional support translating their proposal into a completed safety improvement.
Hazard Type
Geographical Scope - Nuts
Geographical Scope
Population Size
Population Density
Needs Addressed
Devisthal Basic School faced a serious safety risk resulting from the construction of the mid-hill highway near its premises. Excavation works had created a steep drop immediately beyond the playground, while the school lacked a compound wall or protective fence.
This exposed children to potential falls and injuries during everyday activities. Teachers were required to maintain close supervision, restricting children's freedom to use the playground safely.
The situation also revealed the importance of including children's perspectives in school safety assessments. Pupils were directly exposed to the risk and could identify how it affected their daily activities.
The initiative addressed three interconnected needs:
- Physical risk reduction: establishing a protective boundary between the playground and the dangerous slope.
- Participatory risk assessment: enabling children to identify hazards and propose priorities for mitigation.
- Institutional coordination: securing agreement and resources from public authorities, school management, programme partners and the local community.
The intervention resulted in the construction of a compound wall and fence, providing a practical response to the safety issue identified by the children.
Schoolchildren were the principal beneficiaries and active participants. Their daily use of the playground exposed them directly to the unprotected drop, while their age and normal recreational activities increased the importance of providing a safe physical environment.
Through the child club network, children were also recognised as stakeholders capable of identifying risks, expressing priorities and advocating for preventive measures.
Teachers and other school users benefited from the intervention through improved conditions for supervising and using the premises.
The initiative operated through cooperation between community-based structures and formal institutions.
Children contributed through the municipal child club network, identifying hazards and proposing the intervention. The school management committee and parent-teacher representatives participated in assessing the problem and coordinating the response.
Municipal and ward authorities provided institutional support and contributed public resources. UNICEF and its implementing partners, including MISS Bajura and the Nepal Red Cross Society, supported the participatory process and the provision of additional construction materials.
Community members contributed voluntary labour, creating a shared implementation arrangement.
The resulting governance mechanism linked children's participation with school management, municipal resource allocation and community action.
Preparedness was strengthened through the CCDRR programme's structured approach to school-based risk identification and preventive action.
Child club members participated in assessments of hazards affecting their school and communicated their priorities to institutional stakeholders. This process enabled school management and local authorities to coordinate a practical mitigation intervention.
At Devisthal Basic School, the principal outcome was the construction of protective infrastructure to reduce exposure to an identified hazard.
Before the intervention, the school lacked adequate protective infrastructure along the exposed playground boundary.
The construction of a compound wall and wire fence addressed this specific safety deficiency. The new barrier separated school activities from the dangerous drop and restricted the entry of animals into the school grounds.
The intervention also helped protect trees planted as part of a school greening initiative.
Stakeholder engagement aimed to ensure that children's perceptions of risk informed practical decisions about school safety and the allocation of resources.
Children were involved in identifying hazards and proposing mitigation priorities, while school management, municipal authorities and implementing partners contributed to discussing and delivering the selected intervention.
The participatory process also strengthened cooperation between the school and the surrounding community by involving residents directly in implementation.
The approach sought to develop children's confidence and capacity to participate in decisions affecting their safety, while improving the responsiveness of local institutions to priorities emerging from school-level risk assessments.
Child club mobilisation: The municipal child club network provided a structure through which children could express concerns and participate in school safety discussions.
Participatory risk assessment: Children identified hazards affecting the school and prioritised the missing protective boundary.
Multistakeholder consultations: Children, school management, local authorities, UNICEF and implementing partners discussed the proposed intervention.
Community-based planning: Stakeholders agreed on construction of the protective wall and fence and established a cost-sharing arrangement.
Collaborative implementation: Municipal financial contributions, programme resources and community volunteer labour were combined to complete the intervention.
Children exercised meaningful influence over the identification and prioritisation of the safety measure implemented at Devisthal Basic School.
Through participatory assessment, child club members identified the absence of a boundary wall as a major risk. They subsequently proposed constructing a wall and fence and presented this priority within consultations involving school authorities, municipal representatives and programme partners.
The proposal was accepted, and the stakeholders agreed on a cost-sharing arrangement to implement it.
The municipality retained responsibility for allocating public funds, while children contributed directly to defining the intervention and securing institutional attention to the problem.
The CCDRR programme provided children with opportunities to develop skills in risk identification, communication, collective problem-solving and engagement with institutions.
At Devisthal Basic School, these capacities were applied to a concrete problem affecting children's everyday safety.
The experience demonstrated to participating children that their contributions could influence decisions and lead to visible improvements in their environment.
The child club network also created an organised channel for communication between children and school or local government representatives.
Such mechanisms can strengthen long-term participation by enabling children to continue identifying emerging risks, articulating collective priorities and contributing to school safety planning.
Vulnerable Groups
Governance
Emergency Preparedness
Infrastructure Readiness
Engagement Level
Empowerment Level
Implementation
Children as active risk assessors: Children contributed directly to identifying a physical safety hazard affecting their school and determining its importance.
Participation linked to local investment: The priority proposed by children was translated into a publicly supported construction intervention.
Multistakeholder financing: Municipal funding was combined with UNICEF-supported programme contributions and voluntary community labour.
Integration of school and community governance: The initiative connected child clubs, school management, local authorities, humanitarian organisations and residents through a shared implementation process.
Tangible and multifunctional outcomes: The completed wall and fence improved playground safety, reduced animal intrusion and supported the protection of the school's greening activities.
Replicable participation mechanism: The sequence of participatory assessment, prioritisation, institutional consultation and locally supported implementation provides an adaptable approach for other schools.
Nepali; English for official documentation
Devisthal Basic School and the relevant municipal and ward authorities, with support from UNICEF Nepal, the Nepal Red Cross Society and MISS Bajura (Malika Integrated Social Service), under the Child-Centred Disaster Risk Reduction programme.
UNICEF and the Nepal Red Cross Society have extensive experience in community-based disaster risk reduction, preparedness and child-centred resilience.
UNICEF's CCDRR programme in Nepal began in 2013 and expanded across multiple districts, combining child participation, school safety activities, local capacity development and community-based risk reduction.
The Nepal Red Cross Society contributed its operational experience in community preparedness, training and implementation of disaster risk management activities.
MISS Bajura supported local school safety interventions and capacity-building activities, while municipal authorities and school management contributed their responsibilities in local governance, education and infrastructure provision.
Municipal child club network: Identification and prioritisation of risks; proposal of the protective intervention.
Devisthal Basic School management committee: Coordination of school-level safety planning and implementation.
Parent-teacher representatives: Participation in identifying and discussing the safety problem.
Municipal and ward government: Institutional coordination and allocation of funds for the compound wall.
UNICEF Nepal: Programme support through the CCDRR initiative.
Nepal Red Cross Society: Implementing partner of the CCDRR programme.
MISS Bajura: Local implementing partner supporting school-level CCDRR activities.
Community members: Voluntary labour supporting construction.
Step 1 — Identification of the safety problem
Road construction along the mid-hill highway created a steep, exposed boundary at the edge of the school playground.
Step 2 — Participatory risk assessment
Children engaged through the CCDRR programme identified hazards affecting their school and prioritised the unprotected boundary.
Step 3 — Formulation of a mitigation proposal
Child club members proposed constructing a compound wall and wire fence to separate the playground from the hazardous drop.
Step 4 — Multistakeholder consultation
The proposal was discussed among the municipal child club network, school management, UNICEF, implementing partners and municipal and ward representatives.
Step 5 — Agreement on resource mobilisation
Stakeholders established a cost-sharing arrangement. The municipality committed resources for the wall, while the CCDRR programme contributed additional construction materials.
Step 6 — Community-supported construction
Construction was undertaken with institutional contributions and voluntary labour from community members.
Step 7 — Completion and use
The completed wall and fence provided a physical safety barrier, enabling children to use the playground more safely and limiting the entry of animals into school grounds.
The intervention combined financial, technical, organisational and community resources.
Financial contributions from the municipality supported construction of the compound wall. Additional materials were supplied through UNICEF's CCDRR programme, while community members provided voluntary labour.
Human and organisational resources included child club members, school representatives, municipal and ward authorities, local partners and community volunteers.
The main material requirements consisted of construction supplies for the protective wall and wire fence.
The initiative illustrates how local financial commitments can be combined with external programme support and community contributions to implement relatively small-scale risk-reduction investments.
The intervention took place within UNICEF's CCDRR programme, launched in Nepal in 2013.
Implementation followed a sequential process involving school risk assessment, identification of priorities, stakeholder consultation, agreement on cost sharing and construction of the selected mitigation measure.
Experience of the Implementing Organisation in DRM
Target Audience
Resources Required
Timeframe & Phases
Participation Results
The intervention demonstrates the value of incorporating children's direct experience into the identification of school safety priorities.
Children were able to recognise a specific hazard, articulate a practical solution and communicate their proposal to decision-makers.
The case also illustrates how child participation can influence the allocation of local public resources when supported by structured consultation and effective coordination.
Combining municipal financing, programme resources and community labour enabled the implementation of a targeted intervention with benefits extending beyond the original safety concern.
The principal challenge was the presence of a serious physical hazard at the school boundary, created by road construction and insufficient protective infrastructure.
The school relied on constant teacher supervision to prevent injuries, demonstrating the limitations of managing the risk through everyday vigilance.
The participatory assessment process helped establish the problem as a priority for collective action. Children contributed their direct experience of the school environment and proposed a practical mitigation measure.
Implementation required coordination among several actors with different responsibilities and resources.
A cost-sharing arrangement enabled the construction to proceed by combining municipal funding, programme-supported materials and community volunteer labour.
The resulting collaboration connected children's priorities with institutional decisions and practical implementation.
The intervention targeted the risk of children falling from the steep, unprotected edge of the school playground.
The principal mitigation measure consisted of constructing a protective compound wall and wire fence along the exposed boundary.
This physical barrier reduced access to the dangerous edge and improved the safety of normal school activities.
The structure also prevented animals from entering the premises, offering additional protection to school grounds and planted trees.
Risk & Mitigation Plan
Scalability and Sustainability
The sustainability of the intervention rests on the continued use and maintenance of the protective infrastructure and the integration of children's participation into school-level risk management.
The completed wall and fence provide a lasting physical measure whose benefits extend beyond the initial project activities, provided that the structure remains in good condition.
School management and local authorities can incorporate periodic inspections, repairs and future safety improvements into ordinary facility-management responsibilities.
The child club mechanism provides a complementary organisational resource through which children can continue raising concerns and contributing to school safety priorities.
The model combines institutional responsibility for infrastructure with community participation in identifying and responding to local risks.
The approach is adaptable to other schools and local communities facing physical safety hazards, infrastructure deficiencies or gaps in participatory risk management.
Replication can follow a sequence of establishing or strengthening student participation structures, carrying out risk assessments, identifying priorities, consulting responsible authorities, mobilising resources and implementing feasible mitigation measures.
The approach is particularly relevant where schools have limited resources and where cooperation between public institutions, external partners and communities can support small-scale improvements.
Its application can extend beyond playground boundaries to other locally identified school safety concerns, provided that proposed measures receive appropriate technical assessment.
The central transferable element is the integration of children's perspectives into practical decision-making and resource mobilisation.
The initiative relied on organisational and social innovation through structured child participation, collaborative planning and shared resource mobilisation.
Its key innovation consisted of enabling children to influence a school infrastructure decision through risk assessment and consultation with public authorities.
The protective wall and fence were conventional construction measures. Their effectiveness was strengthened by the participatory process through which the intervention was identified, prioritised and implemented.
Direct costs included construction of the compound wall, installation of the wire fence and procurement of the necessary materials.
The municipal government financed construction of the wall, while additional construction materials were supported by the UNICEF-backed CCDRR programme.
Community members provided voluntary labour, reducing the need for externally financed labour inputs.
The intervention was delivered through an agreed cost-sharing arrangement between local institutions, programme partners and residents.
Following construction, operational needs principally concern the maintenance and inspection of the protective wall and fence.
Relevant activities include checking structural integrity, repairing damage and ensuring that the school boundary continues to function safely.
These activities can be integrated into regular school facility management and local infrastructure maintenance arrangements.
The participation mechanism also involves modest organisational resources for child club meetings, communication with school management and periodic review of safety priorities.
The case illustrates how participatory mechanisms can contribute to sustainable local improvements when they are connected to institutional responsibilities and financing arrangements.
Children's identification of hazards helped direct attention and resources towards a concrete safety priority.
Cost sharing between public authorities, implementing partners and community members enabled the intervention to be completed through complementary contributions.
The experience highlights the wider value of establishing regular channels for children's participation in school governance and risk-reduction planning.
Its potential for replication lies in an accessible process combining local knowledge, institutional cooperation, feasible mitigation measures and community ownership.