In flood-prone Belkuchi, residents, parents and teachers jointly planned and implemented a raised playground serving as a flood shelter, alongside a connecting access road. Supported by Manab Mukti Sangstha, the intervention addresses school access and continuity of education through community-selected protective infrastructure.
Map
Charbel Primary School community flood-resilience intervention
General Information
Francesca Sabatini (ISIG)
Charbel Government Primary School stands in Vangabari village, Bardhul Union, Belkuchi Upazila, Sirajganj District, on the banks of the Jamuna River in northern Bangladesh. Its land flooded for months during the monsoon, halting classes. Within the Enhancing Disaster Resilience Capacity (EDRC) project, started in 2023 by Manab Mukti Sangstha with support from Oxfam GB and KOICA, the community selected the school as a top priority for its Cash for Work initiative. Local residents, parents and teachers planned and built a raised school ground that stays above flood level and doubles as a flood shelter for 20–25 households, together with an access road for students, teachers and guardians. Classes can now continue through the monsoon.
Every year floods and river erosion along the Jamuna wash away homes, farmland and services. The school was founded by local volunteers in the 1970s and later became a government school. It had to relocate four times because of erosion, and by 2020 its building was again unsafe. Local leaders donated new land in Vangabari, but the site was low-lying and remained flooded for months in the monsoon, leaving children without school and exposed to unsafe journeys.
Hazard Type
Geographical Scope - Nuts
Geographical Scope
Population Size
Population Density
Needs Addressed
Monsoon flooding and river erosion repeatedly interrupted education at Charbel Government Primary School: the schoolyard and its access flooded for months, classes had to stop, and children faced unsafe journeys. Nearby households also lacked a safe place to shelter during floods.
Primary school children, whose education stopped for months during floods and who faced unsafe journeys to school.
The community identified the priority and carried out the works through a Project Implementation Committee including parents, within a project run by Manab Mukti Sangstha with support from Oxfam GB and KOICA.
The raised school ground serves as a flood shelter for 20–25 households during floods.
A raised playground-cum-flood shelter above flood level and a connecting access road usable in the rainy season.
To let the community choose and build the protective infrastructure it considered most urgent, keeping the school open during the monsoon.
Community prioritisation within the Cash for Work initiative; joint planning by residents, parents and teachers; a Project Implementation Committee; construction by local residents paid through Cash for Work.
The community selected the school as the top priority for the Cash for Work initiative, and residents, parents and teachers planned and built the works.
Cash for Work employed 150 residents for 15 days. The ground is also used by the wider community, for example for Eid prayers attended by over 300 people.
Vulnerable Groups
Governance
Emergency Preparedness
Infrastructure Readiness
Engagement Level
Empowerment Level
Implementation
A single community-selected structure serves several purposes: a raised schoolyard that keeps classes running during the monsoon, a flood shelter for neighbouring households and a community gathering space. Construction through Cash for Work also brought income to local residents.
Bengali.
Manab Mukti Sangstha (MMS), a member of the Global Network of Civil Society Organisations for Disaster Reduction (GNDR), with support from Oxfam GB and KOICA.
Local residents, parents and teachers of Charbel Government Primary School; Project Implementation Committee; Manab Mukti Sangstha; Oxfam GB; KOICA; local leaders who donated the school land.
- 2023: Manab Mukti Sangstha starts the EDRC project in Belkuchi Upazila.
- Through the Cash for Work initiative, the community identifies Charbel school as a top priority.
- Residents, parents and teachers plan the raised playground-cum-flood shelter and the access road.
- 150 residents build the works over 15 days, paid through Cash for Work.
- The school runs classes through the monsoon and the ground is used as a flood shelter and community space.
External funding from Oxfam GB and KOICA through the EDRC project; local labour paid through Cash for Work.
EDRC project started in 2023; the construction works employed residents for 15 days.
Experience of the Implementing Organisation in DRM
Target Audience
Resources Required
Timeframe & Phases
Participation Results
Letting the community choose the priority led to infrastructure that protects education, shelters families and serves community life. A parent on the Project Implementation Committee noted that the school used to close when the rains came, while children can now study and play safely.
The raised ground keeps the school above flood level and provides shelter for 20–25 households during floods.
Risk & Mitigation Plan
Scalability and Sustainability
The approach, community selection of protective infrastructure built through Cash for Work, can be applied in other flood- and erosion-prone areas along major rivers.
Cash for Work injected 900,000 taka into the local economy, employing 150 residents for 15 days.
Resilience is built when local voices lead. GNDR and Manab Mukti Sangstha call for funding for resilience, not only for disaster response.