Landowners formed an association to coordinate river and wetland restoration across property boundaries. Through voluntary participation and a representative board, they organise measures including re-meandering, flood storage and wetland restoration. The initiative combines collective water management with adaptation to alternating floods and droughts.
Map
Tullstorp Stream Project
General Information
Francesca Sabatini (ISIG)
The Tullstorp stream (Tullstorpsån) is a 30 km watercourse in Skåne County, southern Sweden, draining a 6,300-hectare catchment in which agriculture covers 85% of the land. In 2009 the landowners along the stream and other local stakeholders formed the Tullstorp Stream Economic Association to restore the whole stream instead of acting through isolated wetland projects. The first project re-meandered and re-naturalised the riverbed and created flood storage areas, buffer strips and wetlands. According to Climate-ADAPT, the target of 200 ha of wetlands was met in 2021, with more than 50 wetlands created or restored and 25 km of stream restored, and nitrogen and phosphorus loads fell by 30% and 50%. A second initiative, Tullstorp Stream Project 2.0, started in 2019 and tests multifunctional wetlands that store excess water and recirculate it for irrigation in dry periods.
The stream was channelised at the beginning of the 1900s, as agricultural land in Scania expanded and wetlands disappeared: between 1805 and 1919 farmland in the region grew from 139,000 to 596,000 ha. In 2009 the ecological status of the stream was classified as bad under the EU Water Framework Directive, which requires good status by 2027; by 2019 it had improved to moderate. Nutrient loads from the catchment reach the Baltic Sea. Farmers in the area face both excess water and shortage: the summer and autumn of 2017 were very wet, while 2018 brought water scarcity, increasing pressure on drainage and irrigation.
Geographical Scope - Nuts
Geographical Scope
Population Size
Population Density
Needs Addressed
Drainage and channelisation for agriculture left the Tullstorp stream in bad ecological condition, with high nutrient loads to the Baltic Sea, flooding problems and difficult management for landowners. Climate change adds alternating wet periods and droughts, which create competing needs for drainage and irrigation. Because the stream crosses many properties, effective measures require coordination among landowners across the whole catchment.
The project is entirely driven by the Tullstorp Stream Economic Association, formed in February 2009 by landowners and other catchment stakeholders. The association has 60 members and a board of seven stakeholder representatives responsible for running the project. A project manager employed by the association handles administration, funding applications, reports and documentation. Restoration works require approval by the Swedish Environmental Court.
Flood storage areas and wetlands along the stream retain excess water during wet periods. Project 2.0 adds multifunctional water reservoirs and customised drainage to store water for use in droughts.
More than 50 wetlands, flood storage areas, buffer strips and 25 km of re-meandered stream. Project 2.0 pilots the restoration of former sugar mill ponds fed by drainage water, storm water and the stream, combined with recirculating irrigation.
To obtain the commitment of all landowners along the stream, so that restoration and water management can be planned and carried out for the whole catchment rather than property by property.
A landowner association with voluntary membership and a representative board; land contracts with landowners; detailed information to landowners; demonstration stretches, such as the 2 km restored next to Jordberga; information campaigns through mass media, conferences and meetings; presentations to the municipality and the County Administrative Board in 2008, before the association was formed.
Landowners decide on and run the project through the association and its board. All 45 landowners along the first part of the stream signed a land contract giving the association the right to carry out restoration and future management, while keeping ownership and use of their land. Participation is voluntary and the time each landowner contributes is optional.
The association has developed the "Tullstorp method", based on landowner commitment, detailed information, patience, a bottom-up approach, voluntary participation and learning by doing through demonstration cases. It is now helping the Ståstorp stream to apply the same method.
Vulnerable Groups
Governance
Emergency Preparedness
Infrastructure Readiness
Engagement Level
Empowerment Level
Implementation
Restoration is organised for the whole catchment by the landowners themselves, across property boundaries, through a single association. Nature-based measures (re-meandering, re-naturalised riverbed, flood storage areas, buffer strips and wetlands) serve several goals at once: lower nutrient loads, better ecological status, flood management, biodiversity and recreation. Project 2.0 combines multifunctional water reservoirs, recirculating irrigation and customised drainage to adapt farming to both excess water and drought.
Swedish.
Tullstorp Stream Economic Association (Tullstorpsåns ekonomiska förening), with the consulting company Naturvårdsingenjörerna AB.
The association has managed the restoration since 2009, and its consultant had a key role in implementation. The association now advises the Ståstorp stream on applying the same method.
Landowners and other stakeholders of the Tullstorp catchment; Tullstorp Stream Economic Association; Naturvårdsingenjörerna AB (consulting company, Hässleholm); County Administrative Board of Skåne; the municipality; Region Skåne; WWF; Swedish Environmental Court.
- 2007: proposals for wetlands at Beddinge meadows.
- March–April 2008: the idea of restoring the whole stream emerges and is presented to landowners, the municipality and the County Administrative Board.
- August 2008: habitat and wetland inventory.
- January–February 2009: project plan and budget; the Tullstorp Stream Economic Association is formed.
- April–November 2009: first wetland completed and first part of the river restored.
- Restoration in three stages of 5–10 km each; the wetland target of 200 ha was met in 2021.
- 2019: Project 2.0 starts with a pre-study, followed by pilots on water storage and recirculating irrigation.
The first project cost about 60 million SEK (about 6 million euros), covered almost entirely by national and international public funds, mainly through the County Administrative Board of Skåne. Landowners receive compensation for land used for stream restoration and subsidies for wetland areas. The Project 2.0 pre-study (0.5 million SEK) and pilots (about 10 million SEK) were funded by a LOVA grant of the County Administrative Board of Skåne, WWF and Region Skåne.
First project from 2009, in three stages, with the wetland target met in 2021. Project 2.0 from 2019, with pre-study and pilots. Monitoring covers river flow, water quality and zoobenthos at a sampling site in the lower project area, and annual fish surveys at five to seven river stations. The pilots of Project 2.0 are to be evaluated before full-scale implementation.
Experience of the Implementing Organisation in DRM
Resources Required
Timeframe & Phases
Participation Results
The multiple ecological, economic and social benefits motivated landowners to take part. Information campaigns through mass media, conferences and meetings led the County Administrative Board to approve the project a few months after it was conceived. Demonstration stretches helped landowners see the results before committing their own land.
Funding is the main challenge. The measures are costly, and the Swedish Rural Development Programme supports river and wetland restoration but not water retention basins or irrigation systems. The long implementation time dampens participants' enthusiasm. The association identifies further risks in dependence on state funding, exhausted pioneers, impatience, misunderstandings and politics. The project manager employed by the association takes on administrative work so that landowners do not have to.
Flood storage areas and wetlands address excess water, while Project 2.0 stores water in multifunctional reservoirs for irrigation during droughts, responding to the wet year of 2017 and the dry year of 2018.
Risk & Mitigation Plan
Scalability and Sustainability
The association owns the rights to carry out restoration and future management through land contracts, while landowners keep ownership and use of their land. According to Climate-ADAPT, the measures can last indefinitely if regularly maintained.
The Tullstorp method is being applied to the Ståstorp stream with the support of the association. The approach is relevant to agricultural catchments that need to reach good ecological status under the EU Water Framework Directive and adapt to floods and droughts.
Nature-based solutions: re-meandering, wetlands, flood storage areas and buffer strips. Project 2.0 tests multifunctional water reservoirs, recirculating irrigation and customised drainage.
First project: about 60 million SEK (about 6 million euros). Project 2.0: pre-study 0.5 million SEK; pilot, including management, method development and implementation, about 10 million SEK (about 1 million euros). In 2019 the association estimated that 1–2 million euros were needed to finish the project.
Landowner commitment, detailed information, patience and voluntary participation are the basis of catchment-wide restoration. A single association representing all landowners can coordinate measures that no individual farm could implement. Long-term funding for water retention and irrigation measures is needed to complete adaptation to both floods and droughts.