A mountain village in Tajikistan at high risk of yearly mudflows planted a living barrier in April 2016 and, in August 2016, received engineered bank protection and a rehabilitated mud channel from the NGO ACTED.
Map
Community mudflow mitigation in Bobuchak
General Information
ISIG
Residents of Bobuchak, a mountain village of 513 people in Tajikistan, built a living barrier of native shrubs against mudflows with the NGO ACTED, which later added bank protection and a rehabilitated mud channel. ACTED, working with Helvetas and the German development agency GIZ (Deutsche Gesellschaft für Internationale Zusammenarbeit) in a Swiss-funded water project, trained community members and used the village as a demonstration site. According to ACTED, the villagers decided on and carried out the April 2016 planting themselves, and the August 2016 works significantly reduced risk for 109 of the village's 117 households and for its schools, medical centre, tea house and mosque. ACTED reports that the measures are not yet enough and must be repeated every year.
Bobuchak lies at 1,799 m, halfway along the Ak-Suu watershed, in Rosrovut Jamoat (a rural local-government unit), Devashtich district. A natural-disaster risk assessment in the village rated it high risk, mainly because mudflows damage homes, social buildings and livestock every year. The village has 513 people in 117 households (ACTED).
The work belongs to the National Water Resources Management project, carried out by a consortium of Helvetas, ACTED and GIZ and funded by the Swiss Agency for Development and Cooperation (SDC). ACTED is responsible for the result on watershed management and disaster risk reduction in the Ak-Suu watershed. It rests on a study of the watershed, which found heavy degradation of natural resources, especially in the middle and upper zones.
Adult men often work abroad or away because of the economic crisis, women are busy with domestic work, and, according to ACTED, teenagers are now the group most often cutting shrubs, dumping rubbish in the dry stream bed and leading grazing animals without understanding the consequences.
Hazard Type
Geographical Scope - Nuts
Geographical Scope
Population Size
Population Density
Needs Addressed
Every year, mudflows damage houses, social buildings and livestock in Bobuchak. The slopes above the village are degraded, and mudflows that start in the pastures are hard to divert because of the terrain. Debris buries restored areas each year. With many men away and women busy at home, teenagers cut shrubs and trees, dump rubbish and graze animals without understanding the effects. Water for planting is scarce.
Women, the elderly and teenagers took part in the works, and community-based organisation members set up activities in which schoolchildren planted and watered seedlings. They are described as participants, not as groups with specific protection measures.
An NGO consortium with a Swiss donor sets the project frame and decided the August 2016 works. Residents decided on and carried out the April planting. Community-based organisations and a Pasture Committee are also involved.
A risk assessment and training were done. No village emergency plan, early-warning system or evacuation arrangement is described.
A planted barrier with water tanks, bank protection and a rehabilitated mud channel.
To involve residents in the restoration so that they understand why mudflows are getting worse and what reduces risk, and to build their skills by doing the work.
Training sessions for community members, followed by restoration work used as a demonstration. Community-based organisation activities with schoolchildren. A Pasture Committee discussion on keeping the pastures where mudflows start. ACTED took the villagers' own activities into account when choosing sites for the August works.
Residents are reported to have chosen and carried out the April 2016 planting, and their activities informed where ACTED placed the August works. The August works themselves were decided and carried out by ACTED. No formal way for residents to decide or to hold the project to account is described.
ACTED trained community members and let them apply the skills in restoration, using cheap local means. Women, teenagers and the elderly joined the work, which was central to building local capacity. Schoolchildren learned about the causes of mudflows by watching and helping with the planting. No information on how many people were trained or whether the training was repeated.
Governance
Emergency Preparedness
Infrastructure Readiness
Engagement Level
Empowerment Level
Implementation
A living barrier of native elm trees and dog rose with water tanks for irrigation (April 2016); Two engineered projects, bank protection and rehabilitation of a mud channel (August 2016); Training and learning by doing; Activities with schoolchildren; A discussion of pasture protection to restore grass cover and slow runoff; ACTED aims to make the village a model for neighbouring villages with similar risk.
Not stated.
ACTED, an international non-governmental organisation, with Helvetas and GIZ in a consortium funded by SDC. Community-based organisations in the village took part.
ACTED leads the disaster risk reduction result for the Ak-Suu watershed, did the watershed study and the village risk assessment, and its own project page lists the water project as running from July 2014.
ACTED (implementer); Helvetas and GIZ (consortium partners); SDC (funder); Residents, including women, teenagers and the elderly. Community-based organisations. Schoolchildren. A Pasture Committee. Local authorities are not named.
- ACTED studies the Ak-Suu watershed (date not given).
- A natural-disaster risk assessment is done in the village and rates it high risk (date not given).
- Community members are trained (date not given).
- In April 2016 residents plant the living barrier and place water tanks.
- Community-based organisation members involve schoolchildren in planting and watering.
- In August 2016 ACTED carries out bank protection and mud channel rehabilitation.
- The Pasture Committee discusses protecting the mudflow starting areas (date not given).
- ACTED reports the work must be repeated every year.
Donor funding paid for ACTED's work; villagers contributed labour and local materials (stones, seedlings, shrubs, wire).
A watershed study, a village risk assessment and two phases of works in 2016; no follow-up or monitoring described.
Experience of the Implementing Organisation in DRM
Target Audience
Resources Required
Timeframe & Phases
Participation Results
Involving residents directly, including women, teenagers and the elderly, helped build their understanding of why mudflows worsen; A first set of low-cost measures was not enough, and engineered works were added; Restoration has to be repeated.
The April planting was not enough, so ACTED added the August works; Debris buries restored areas after each mudflow, so restoration must be repeated each year; Scarce water led to water tanks for irrigation; Mudflows cannot easily be diverted in the upper reaches because of the terrain, so the Pasture Committee discussed restoring grass cover.
Planted shrubs fail or are cut again: involve teenagers and schoolchildren, as ACTED did, and keep water available.
Debris from new mudflows buries the works: plan yearly maintenance.
Project funding ends: agree who maintains works before the donor leaves; the ACTED project page lists November 2026 as the end date.
Residents have no formal voice in later decisions: set up a village committee with a defined role.
Risk & Mitigation Plan
Scalability and Sustainability
No public information on how the works are maintained or paid for after 2016 was found in the sources reviewed. Based on the available information, it can be inferred that upkeep of the planted barrier depends on residents' labour and water, while repairs to the engineered works depend on outside funding.
The project describes the village as a model for neighbouring villages with similar risk. What transfers: training followed by demonstration works with local materials, and the involvement of schoolchildren and teenagers. What needs adapting: the species and water supply for the planted barrier, the engineering to the local terrain, and the link to local authorities.
Low-cost planting, water tanks, bank protection and mud-channel works. No early-warning, monitoring or digital tools are described.
No public information found. Likely costs involve the watershed study and risk assessment, trainings, seedlings, shrubs, stones, wire and water tanks, engineering for bank protection and the mud channel, and staff.
None found. Would likely involve yearly clearing of debris, replanting, watering, repair of the engineered works, and any repeat training.
A donor-funded project can start community work, but the measures need yearly repetition; An outside summary of the wider project lists, as limits, that communities are excluded from decisions after the participatory phase and that changing habits is slow; A transfer should settle ownership and maintenance with the village and local authority from the start.